• Home
  • DIY
    • Self build
    • Projects and advice
      • Bathroom
      • Building, brickwork and masonry
      • Ceilings
      • Cleaning
      • Concrete work
      • Damp, rot and infestation
      • Drains
      • Electrical
      • Fireplaces
      • Floors
      • Garden
      • Heating
      • Insulation
      • Kitchen
      • Lighting
      • Lofts
      • Painting and decorating
      • Plasterwork
      • Plumbing
      • Roof and guttering
      • Safety
      • Security
      • Tiling
      • Walls
      • Windows
      • Woodwork
    • Glossary
    • Know your tools
    • Know your materials
  • Cost guides
  • News
  • Community
Facebook Twitter Instagram
lets-do-diy.com
  • Home
  • DIY
    • Self build
    • Projects and advice
      • Bathroom
      • Building, brickwork and masonry
      • Ceilings
      • Cleaning
      • Concrete work
      • Damp, rot and infestation
      • Drains
      • Electrical
      • Fireplaces
      • Floors
      • Garden
      • Heating
      • Insulation
      • Kitchen
      • Lighting
      • Lofts
      • Painting and decorating
      • Plasterwork
      • Plumbing
      • Roof and guttering
      • Safety
      • Security
      • Tiling
      • Walls
      • Windows
      • Woodwork
    • Glossary
    • Know your tools
    • Know your materials
  • Cost guides
  • News
  • Community
lets-do-diy.com
You are at:Home»Projects and advice»How to build decking

How to build decking

Summary: Learn how to do decking, lay decking, treat the timber, lay a base, construct the decking, construct raised decking, install posts, fix the frame, fix the boards, erect a balustrade and steps, assemble the steps, construct a stringer and fix the steps.


Timber decking can be an economical means of creating a sun terrace or outdoor seating area. Decking can be designed to fit any space, and can either be erected at ground level or raised on a platform. If you live in a listed area you will need to get permission from your local Building Control Department, as well as planning permission.


Treating timber

Make sure that the timber you buy has been suitably pressure-tested and weatherproofed. If you cut the timber, you will need to treat the cut ends with wood preserver as well.


Ground level decking

If your chosen decking area has an existing hard surface, such as concrete or stone slabs, these can remain in place under the decking. If not, you will have to lay a gravel base to prevent weeds from growing up through the decking.


Place concrete slabs every metre around the marked out area and check that they are level.
Lay weed proof membrane over the area, cutting around the slabs with scissors.
Spread gravel around the slabs to level out the surface.

Laying a base

  • Mark out the decking area using string lines tied to stakes driven into the soil.
  • Clear the decking area of any vegetation.
  • Place the concrete slabs at least every metre (3ft 3in) around the marked out area.
  • Place a spirit level between slabs to check that they are level. If not, pack gravel underneath to level them.
  • Lay a weed proof membrane over the area, cutting around the slabs with scissors.
  • Spread gravel around the slabs on top of the membrane to level out the surface.

























Position the first decking board on the edge of the frame furthest from the house and screw it to the frame in each corner.
Leave an expansion gap of 5mm between the boards.

Constructing the decking

  • Using 75mm x 50mm (3in x 2in) timber joists build a timber frame to go around the perimeter of the decking area. These will act as bearers for the decking boards. The joists are fixed together with countersunk 75mm (3in) screws suitable for outdoor use. Joists that need to be secured to a wall can be fixed using 100mm (4in) masonry bolts.
  • Check that the joists are level and come together at the corners at right angles. If your decking is square or rectangular in shape measure the diagonals to check that the frame is perfectly square (the measurements should be the same).
  • Cut and fix more joists inside the frame at 400mm (1ft 3in) intervals.
  • Position the first decking board on the edge of the frame furthest from the houseand screw it to the frame with a screw in each corner.
  • Position the next board leaving an expansion gap of 5mm (1/5in) between the boards.
  • Continue to lay boards in this way, maintaining the width of each expansion gap with wooden wedges.
  • The last board will need to be cut and scribed to fit against the wall. Remember to treat the sawn edges with wood preserver.
  • Finally, conceal the framework with fascia boards screwed to the outside of frame.



Support the frame on blocks or bricks and use a spirit level to check that it is level.

Raised decking

To construct a raised decking, you will need to secure the platform to posts in the ground. These can be fixed to concrete with post brackets, or concreted into the ground.

  • Make a decking frame to cover the decking area (see above).
  • Support the frame on blocks or bricks to achieve the desired height using a spirit level to check that it is level.
  • Where the frame needs to be fixed to a wall, mark the fixing points along the frame. Drill pilot holes through the frame for frame-fixings.

Position posts at regular intervals inside the frame and mark around them with a trowel.

Installing posts

  • Position the 100mm x 100mm (4in x 4in) posts at regular intervals inside the frame.
  • Mark around the posts with a trowel.
  • Remove the frame and dig out the holes you have marked for the posts. The hole should have a depth and width of 300mm (12in). The holes should be deeper if the decking is being raised high above the ground.
  • Check the position of the holes by putting the framework back in place.
  • When satisfied that the holes are in the right position, pour hardcore into the bottom of the hole to a depth of 100mm (4in).
  • Lay a weed proof membrane over the area, cutting around the post holes with scissors.
  • Secure the membrane with a layer of gravel, spreading the gravel out evenly.
  • Position the posts in the holes and check that they are vertically plumb with a spirit level.

Insert frame fixings into the holes in the frame and fix the frame to the wall.
After securing your posts, saw off any excess so they are flush with the frame.

Fixing the frame

  • Insert frame fixings into the holes in the frame, tapping them in with a hammer, and fix the frame to the wall.
  • Attach the posts to the frame. The most secure method of doing this is to drill a hole through both post and frame, and butt them together with a nut and bolt.
  • Pour concrete or post mix into the hole around the post and leave it to set.
  • Saw off any excess timber to make the posts flush with the frame.

Fixing the boards

  • Position the first decking board on the edge of the frame furthest from the house.
  • Screw it to the frame with a decking screw in each corner.
  • Position the next board leaving an expansion gap of 3-10mm (1/8-1/3in) between the boards.
  • Maintain the gap with wooden wedges as you fix the other boards to the frame.
  • Continue to lay boards in this way. The last board will need to be cut and scribed to fit against the wall. Remember to treat cut edges with wood preserver.
  • Conceal the framework with fascia boards screwed to the frame.



Tools needed

  • Tape measure
  • String line
  • Shovel
  • Spirit level
  • Scissors
  • Power drill
  • Panel saw OR jigsaw
  • Spade shovel

Materials needed

  • Timber joists
  • Decking boards
  • Decking fascia board
  • Timber posts
  • Wood preserver
  • Paving OR patio slabs
  • Gravel
  • Weed-proof membrane
  • Screws OR masonry bolts
  • Frame-fixings
  • Hardcore
  • Concrete

Cut a 20mm rebate from the base of each newel.
Resting the newel on the decking drill two holes through the base of the newel into the decking frame.
Use your batten as a template to maintain the space between each spindle.

Erecting a balustrade and steps

If you are intending to install steps in the decking, you will need to make an opening between the sections of balustrade. Your balustrade kit should contain newel posts, handrails, and balusters or spindles. A raised decking kit will come with stringers and tread boards as well. Ensure your kit contains enough newel posts to place one each side of the steps as well as in the corners.

  • Cut a 20mm (4/5in) rebate from the base of each newel.
  • Position a newel at the end of each section of balustrade.
  • Rest the newel on the decking and drill two holes through the base of the newel into the decking frame.
  • Insert nuts and bolts to secure the newel to the frame.
  • Cut the hand and base rails to fit between the newel posts.
  • Position the rails and check they are level.
  • Fix the rails with screws to the newel posts.
  • Measure the required distance between spindles. This should be less than 100mm (4in) and cut a batten to this measurement.
  • Use this as a template to position the spindles.
  • Fix the top and bottom of each spindle in place with galvanised wood screws.














Screw the treads onto the stringer supports.

Assembling steps

If the steps are being placed on soil, level and weedproof the surface. You could use a paving slab or gravel to do this. If you are using a kit, simply fix the stringer to the frame and screw treads onto the supports.

Constructing a stringer

  • To make your own stringer, measure the height of the deck to determine the total height of the stringer.
  • To calculate the number of steps, divide the height by 175mm (7in) which is the usual height for risers. Round up or down if necessary to make whole steps e.g. 670mm (26in) divided by 175mm (7in) = 3.8 which rounds up to 4 steps.
  • Divide the total height by the number of steps to determine the height of each riser e.g. 670mm (26in) divided by 4 = 167.5mm (61/2in).
  • To work out the position of the treads, subtract the riser height from the total height e.g. 670mm (26in) minus 167.5mm (61/2in).
  • Mark out the position of the risers and treads on the stringer using a ruler.
  • Check the depth of timber for the treads supplied – usually about 25mm (1in) thick.
  • Below your marked lines, draw lines to represent the bottom of the treads – usually 25mm (1in) below. These lines will be your horizontal cutting lines.
  • The tread width should be roughly twice the riser height but may vary depending on your kit.
  • Transfer this measurement onto the stringer to mark the position of the front edge of the first tread.
  • To work out the edges of the tread below subtract an overhang of 25mm (1in). The top step may not have an overhang as it connects with the decking.
  • Then subtract the thickness of the risers. Transfer this measurement onto the stringer to give you the vertical cutting line.
  • Continue in this way to calculate and mark out the position of the front edges of the treads.
  • Draw a line connecting your horizontal tread markings.
  • Draw a second line parallel to the first 285mm (11¼ in) below it.
  • Complete the outline of the stringer by connecting up the parallel line with the top tread and bottom riser to make a whole shape.
  • Check that the angles are 90° with a square.
  • Cut out the stringer using a jigsaw and use it as a template for the second stringer.

Fixing the steps

  • Fix the top of the stringers to the deck.
  • If you wish to secure the bottom of the stringers, fix them to posts in the ground or use an angled bracket to fix onto concrete.
  • Install riser boards (optional), securing them with nails or an angle bracket.
  • Screw or bracket down the treads onto the stringers.

Tools needed

  • Tape measure
  • Panel saw
  • Jigsaw
  • Power drill
  • Spirit level
  • Screwdriver
  • Metal rule
  • Try square

Materials needed

  • Newel posts
  • Handrails
  • Balusters
  • Spindles
  • Stringers
  • Treads
  • Nuts and bolts
  • Galvanised wood screws

Related projects

  • Building a barbeque
  • Building a pergola
  • Erecting a panel fence
  • Installing pond liners
  • How to stain decking

Related cost guides

  • Average cost of a driveway
  • Average cost of a greenhouse
  • Average cost of a shed
  • Average cost of a swimming pool
  • Average cost of block paving
  • Average cost of decking
  • Average cost of landscaping
  • Average cost of soil
  • Average cost of tree removal
  • Average cost to hire a cherry picker
  • Average cost to hire a mini digger
  • Average cost to lay turf
  • Average fence installation cost
  • Average patio cost
  • Average tennis court cost
Recent Comments
  • Vic on Is Christmas a good time for DIY?
  • Anonymous on Average air source heat pump cost (2022)
  • Reggie on Prepare your home for moth season
Latest News
0

Potential DIY home improvement trends for 2023

1

Is Christmas a good time for DIY?

0

Design trends for 2022 and 2023

0

Product Review: Handsaws

Popular Guides

Average cavity wall insulation cost

Average cost of a new bathroom

Average cost of granite worktops

Average TV aerial installation costs

Popular Projects

Installing a new electric socket

How to install a shower screen door video

Using a chalk line

How to clean grout

DIY Categories
Bathroom
Building, brickwork and masonry
Ceilings
Cleaning
Concrete work
Damp, rot and infestation
Drains
Electrical
Fireplaces
Floors
Garden
Heating
Insulation
Kitchen
Lighting
Lofts
Painting and decorating
Plasterwork
Plumbing
Roof and guttering
Safety
Security
Tiling
Walls
Windows
Woodwork

Self Build Guide
How to find a building plot
Evaluating a building plot (2023)
How to get a self build mortgage
Self build construction options
Self build architect and design considerations (2023)
Self build planning permission and legal consents
© 2023 lets do diy ltd | ebuild
  • Home
  • About
  • Contact us

Type above and press Enter to search. Press Esc to cancel.

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies. However, you may visit "Cookie Settings" to provide a controlled consent.
Cookie SettingsAccept All
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT